Design and Complete Pool Study
For the perfect and mastery construction of the swimming pool at the initial stage is chosen in coop operation with the mechanical-engineer of the client the appropriate place of the plot where the construction of the swimming pool will be done.
In order to select the appropriate place it is very important to take in consideration the quality of the ground where the swimming pool will be supported and the particularity of the climate in each region.
Piscinity can make dreams come true by planning step by step the construction of the swimming pool in the way that the clients wish and with the materials that they want.
The pool construction consists of:
Pool Frame
The construction of the pool frame is an important decision.
Pool Equipment
The filtration unit is the "heart" of the pool and for this reason is of vital importance.
Final Surface
The final surface of the swimming pool has a multiple role, both functionally and aesthetically.